Construction waste is the global conundrum around the globe by the
contractors and researchers. Increasing waste could lead to the failure of the
construction project. More specifically, Productivity, sustainability,
construction cost and construction time are one of the aspects which are hugely
impacted by construction waste. The study was made to identify different
factors resulting construction waste in Sindh province. A comprehensive
structured questionnaire was set focusing on three branches (i.e Clients,
Contractors & Consultants) working in construction projects of Sindh.
Statistical software package SPSS was used to integrate the data. Reliability
of which was found as 0.89 justifies the reliability of data collected. Mean
rank calculations of causes listed the key critical factor to be
“unreliable strategies for minimization of waste”, “unreliable
management plan for waste”, “ineffective scheduling and planning of the project
by the contractor”, “conversion waste from cutting uneconomically shapes”, “use
of excessive material quantity more than the required”, “difficulties in
obtaining work permit”, “inadequacy of instruction regarding stacking and
incorrect material usage therefore it require replacement”. Through methods to
identify the causes of construction waste in Sindh province it is aimed to
provide good service to construction firms in present and future projects both
in terms of environment and the economy.
Country : Pakistan
IRJIET, Volume 4, Issue 10, October 2020 pp. 7-13